Xxinstall individual shakes over wall construction with framing spaced no more than 24 o c.
Allura siding installation.
Do not overdrive the nails.
Xx see the recommendations on page 20 before installing allura fiber cement siding over structural insulated panels thicker than 1.
And a minimum of 7 16 osb or 1 2 plywood sheathing.
Then you would install your fiber cement corner and window trim.
Xx apply siding over a weather resistant barrier in.
With 10 gorgeous new colors and 1 new stain our outstanding color palette has now extended to 30 total colors.
And a minimum of 7 16 osb or 1 2 plywood sheathing.
Use galvanized siding nails and make sure that the nails penetrate a minimum of 1 1 4 inches into the framing.
Allura fiber cement siding is tested in accordance with astm1186 in the u s.
Allura fiber cement siding installation manualconcrete masonry cmu or poured concrete wallsconsult applicable building codes before installing allura fiber cement siding on cmu or a concrete wall the cmu or concrete wall must be able to resist all loads transferred from the siding.
These testing standards include a stringent review of more than a dozen properties such as flexural strength moisture movement frost resistance transversal loading and water.
Position your first course of siding inch below the starter strip and nail the siding into the studs 1 inch down from the top of the siding.
Xxsee the recommendations on page 20 before installing allura fiber cement siding over structural insulated panels thicker than 1.